Proton detectionCertification Laboratory
National Service Hotline0755-23009643
Choose AnXin and Believe in the Power of Professionalism
Contact Us
Official Hotline:0755-23009643

Phone:13480851933

Fax:0755-23009643

QQ:25807313

Email:258073130@ qq.com

Address:深圳市宝安区西乡街道固戍二路裕兴科技园(裕兴创谷)C栋4楼

CB certification

CB system (IEC system for qualification testing and certification of electrical products) is an international system operated by IECEE. The safety performance of electrical products is tested by certification bodies of IECEE member countries on the basis of IEC standards, and the test results, namely, CB test report and CB test certificate, are mutually recognized by each member country of IECEE. The aim is to reduce international trade barriers that arise from having to meet certification or approval criteria in different countries. IECEE is the international electrotechnical commission electrical products qualification testing and certification organization

Scope of certification

The products covered by the CB system are products within the scope of IEC standards recognized by the IECEE system, and there are 16 categories.

1) battery (BATT);

2) cable (CABL);

3) capacitors (caps) as components;

4) automatic controller (CONT) for appliance switches and household appliances;

5) energy efficiency (E3);

6) electric vehicle (ELVH);

7) household and similar equipment (HOUS);

8) install accessories and connection devices (INST);

9) lighting equipment (LITE);

10) miscellaneous class (MISC);

11) information technology and office equipment (OFF);

12) low-voltage high-power switching equipment (POW);

13) install protection equipment (PROT);

14) safety transformers and similar equipment (SAFE);

15) portable power TOOL;

16) electronic entertainment equipment (TRON).

Information required for CB certification

1. Application form (three parts: applicant information, producer information and product information)

2. English version product specification (please indicate the maximum ambient temperature of the product)

3. Product specification in English

4. Schematic diagram of English version circuit

5. English PCB LAYOUT

6. Specification of key components

7. List of key components of English version CDF

8. English Bom List

9. CB label (including product name, model, parameters, MADE IN CHINA, Logo and trademark)

10. Other technical data (evaluation after the product is provided)

Certification application process:

1. Submit the application form to the laboratory, prepare the sample, sign the contract and pay the advance payment.

2. Test and report, preliminary review of materials, time: 2 weeks.

3.NCB agency: final audit, certification, payment balance payment. Time: 1-2 weeks. (partners: tuv-rh, tuv-sud BV, ITS, etc.)